Appendices
Moultonborough Bay Inlet WRP Executive Summary (PDF 426KB)
Moultonborough Bay Inlet Watershed Restoration Plan (PDF 4MB)
Appendices
- Appendix A: Site Specific Project Plan
- Appendix B: Thematic GIS Maps
- Appendix C: Select Nutrient Modeling Results
- Appendix D: Top 20 BMP Sites
- Appendix E: UNHSC Designs for BMP Sites
- Appendix F: Shoreline Survey Results
- Appendix G: Culvert Replacements
Moultonborough Source Water Protection Plan, September 2016 Produced by Granite State Rural Water Association
Individual reports that have provided information and content for the Draft Plan